1.PREPARED BASIS1
-
编制依据1
-
2.GENERAL2
-
项目概要2
-
2.1 Project brief2
-
项目简况2
-
3.CONSTRUCTION DISPOSAL4
-
施工部署4
-
3.1、Construction organization setup施工组织机构设置4
-
3.2 Construction preparation施工准备7
-
3.3 Temporary facility plane layout临时设施平面布置11
-
3.4 Overall layout and order arrange总体规划及顺序安排14
-
3.5 Project management object工程管理目标15
-
4.RESOURCE REQUIRED PLAN16
-
资源需求计划16
-
4.1 Construction schedule施工进度计划16
-
4.2 Labour used plan劳动力使用计划17
-
4.3 Equipment and machine plan机械与设备配备计划18
-
5.MAIN WORK CONSTRUCTION PLAN19
-
主要工程项目
施工方案
19
-
5.1Survey control测量控制19
-
5.2 Pile head Cutting and Concrete Treatment Construction Plan 桩头切除及混凝土处理
施工方案
26
-
5.3 Drainage/Well point of dewatering排水/井点降水方案30
-
5.4 Steel sheet piling works钢板桩工程35
-
5.5 Earth work土方工程40
-
5.6 Rebar work
钢筋工程
45
-
5.7 Form work模板工程56
-
5.8 Concrete work
混凝土工程
64
-
5.9 Mass concrete structure construction 大体积混凝土结构施工68
-
5.10 Procedure for the construction of 400mm RC wall 400mm厚钢筋混凝土板墙施工专项方案78
-
5.11 Special procedure for pool deep foundation pit 水池深基坑专项方案87
-
5.12 Scaffold work脚手架工程93
-
5.13 Finishing works for inner and ouoter wall and ceiling 内外墙、顶棚装饰工程98
-
5.14 Window & door installation 门窗安装工程104
-
5.15 Floor works楼地面工程106
-
5.16 Roof works 屋面工程109
-
5.17 Tower Crane’s Installation & Removal Procedure 塔吊安拆方案109
-
5.18 Construction during winter or rainy season 冬雨季施工工程109
-
6.SCHEDULE MANAGEMENT PLAN128
-
进度计划控制及保证措施128
-
6.1 Execution stratigy编制原则128
-
6.2 Preparation conditions 编制条件129
-
6.3 Plan management course计划管理过程129
-
6.4 Schedule tracing procedure进度跟踪程序130
-
6.5 Schedule control and reporting进度计划的控制及报告132
-
6.6 Measures assuring schedule control 进度计划控制的保证措施132
-
6.7 Corrective actions for lagging behind the schedule 进度滞后整改措施134
-
7.PROCUREMENT PLAN & MATERIAL CONTROL PLAN136
-
采购计划和材料管理计划136
-
8.QA/QC PLAN147
-
质量控制
计划及方案147
-
8.1.Compile this plan’s basis编制本计划的依据147
-
8.2.Purpose目的148
-
8.3.Project overview项目概要148
-
8.4.Quality objective 质量目标149
-
8.5.Management responsibility管理职责150
-
8.6.Personnel allocation and duty authority人员配备及职责权限150
-
8.7.Quality system质量体系153
-
8.8Set the quality management point 质量管理点的设置157
-
8.9.Control of purchase采购控制164
-
8.10.Procurement documents采购文件164
-
8.11.Process inspection and handover工序验收及移交168
-
9.HSE MANAGEMENT PLAN(INCLUDING JHA)170
-
HSE 管理方案(包括JHA)170
-
9.1.General总则171
-
9.2.Project HSE Objectives项目HSE目标171
-
9.3.HSE POLICY 方针171
-
9.4.HSEPHILOSOPHY HSE原则172
-
9.5.LEADSHIP AND COMMITMENT领导承诺173
-
9.6.HSE ORGANIZATION AND RESPONSIBILITIES机构与职责173
-
9.7.EDUCATION AND TRAINING教育和培训179
-
9.8.SITE RULES/REGULATIONS现场规范与各项作业要求181
-
9.9.FIRE PREVENTION & PROTECTION防火&消防193
-
9.10.HEALTHY AND ENVIRONMENTAL HAZARDS健康与环境危害195
-
9.11.safety rules文明施工规定196
-
9.12. Operation tickets regulations作业票规定198
-
9.13.Project Disciplinary Policy and Procedures项目处罚规定199
-
9.14.HAZARD AND RISK MANAGEMENT危险源与风险管理201
-
9.15.LEGAL AND OTHER REQUIREMENTS法规及其他要求212
-
9.16.Communication协商与沟通213
-
9.17.HSE Meeting安全会议213
-
9.18.Safety Task and Risk Reduction Talks班前安全讲话214
-
9.19.INSPECTIONS AND AUDIT检查及审核215
-
9.20.Emergency Preplan应急预案217
-
9.21.FIRST AID / MEDICAL FACILITIES急救/医疗设施220
-
9.22.ACCIDENT/INCIDENT INVESTIGATIONS & ANALYSIS事故/事件调查分析222
-
9.23台风预防措施224
-
9.24.Risk Analysis风险分析226
附件详情
框剪结构扩建厂房工程
施工组织设计
,中英文,245页,包括项目概要、施工部署、
施工方案
、施工技术措施、安全施工措施等,可供参考学习。
……
A440为光气发生仓,钢筋混凝土框架剪力墙结构,建筑抗震设防类别甲类,结构抗震等级一级,占地面积650m2,建筑面积2167m2,建筑高度33.5m;A441为HCL吸收及尾气处理,混凝土框架结构,建筑抗震设防类别乙类建筑抗震设防类别甲类,结构抗震等级一级,占地面积227m2,建筑面积497m2,建筑高度28.93m;A442为HCL压缩机单元,建筑抗震设防类别甲类,占地面积96m2;A443为MDI初期雨水池单元,建筑抗震设防类别丙类,占地面积37m2;A444为氯苯冷却单元,钢筋混凝土框架剪力墙结构,建筑抗震设防类别甲类框架抗震等级为三级,结构剪力墙抗震等级为二级,占地面积190m2,建筑面积190m2;A445为氯苯精馏单元,钢筋混凝土框架剪力墙结构,框架抗震等级为三级,剪力墙抗震等级为二级,建筑抗震设防类别甲类,结构抗震等级二级,占地面积759m2,建筑面积3864m2,建筑高度24m;
……
主要工程项目施工方案:
1 测量控制
2 桩头切除及混凝土处理施工方案
3 排水/井点降水方案
4 钢板桩工程
5 土方工程
6 钢筋工程
7 模板工程
8 混凝土工程
9 大体积混凝土结构施工
10 400mm厚钢筋混凝土板墙施工专项方案
11 水池深基坑专项方案
12 脚手架工程
13 内外墙、顶棚装饰工程
14 门窗安装工程
15 楼地面工程
16 屋面工程
17 塔吊安拆方案
18 冬雨季施工工程109
……